• facebook
  • twitter
  • youtube
  • google +
Tel : +90 212 450 25 26 | Mail : kiriklar@kiriklar.com.tr

Kırıklar İnşaat | İnşaat Taahüt | Kentsel Dönüşüm

Completed Projects

header-resim

Completed Projects

ARAM CİTY

started in April 2012. It is a boutique Project of ours consisting of 120 flats and 12 shops in total in 4 blocks. Our Project which shelters the 2000 m2 Indoor Car Parking Area, Outdoor Swimming Pool, Gym, Children’s Play Ground, Pergola and Walking Trail and Security Services was delivered in July 2013 ready to live.

MERT DESİGN RESİDANCE

Our Project; It consists of 1+1, 2+1, 3+1 housing options and 9 shops. The Project that started in February, 2013 consists of 88 flats on 11 floors and 9 shops on the ground floor. Our building which shelters 7/24 Security Service, Sauna, Fitness, Gym and Indoor Car Park was delivered as ready to live in August, 2014.

LİVELLO OTEL

DETAIL – 8-storey, 83-room five-star hotel on 6500 m2 closed area on the E-5 main artery

ARAS CITY

The Project whose construction started in May, 2011, was delivered in July, 2012. In the Project which consists of 4 Blocks, there are 60 flats and 10 shops in total. It is situated in the shopping center in Araskent Saadetdere, in a very lively location.

BALKAN HOUSES

There are 32 flats in total in the 2 blocks each of which consists of 16 flats. It has an indoor parking. It was completed in August, 2012, and delivered. Children’s play areas and landscape arrangements, it starts rising in a 400 m. Distance to KARTAL E-5 Subway station. It is being planned to be delivered in 24 months.

GAZİOSMANPAŞA BUSINESS CENTER

Our 9-storey building which was finished in 2013 was rented out to G.O.P. Physical Therapy Center.

KIRIKLAR PLAZA CONSTRUCTION

Kırıklar Construction Plaza shop 6, 24 occurs from the home office.

KONYA GOVERNORATE (SCHOOL AND DORMITORY BUILDING)

It is the School with 24 Classrooms and Dormitory Building with 200 beds. The dormitory building has been opened to service as a full-fledged State Dormitory consisting of a Restaurant, Cafeteria and Sports fields.

CEYLANOĞLU HEALTH CENTER

The building which was started in January 2011 and finished in November in the same year has been delivered to Erzurum Provincial Health Directorate.

DORMITORY (200 PEOPLE) Karayazı / Erzurum

It was started in September, 2010 and was delivered to Erzurum Province National Education Directorate in September 2011.

DORMITORY (FOR 150 PEOPLE) Hınıs / Erzurum

The building which was started in January 2012, and delivered in November 2012, has been transferred to the Directorate of National Education as Hınıs Foundation Dormitory.

Hospital

DETAIL – Erzurum Family Health Centres and Community Health Hospital in Karayazı county building construction work. Erzurum Province in 2014 was submitted to the Health Department

İSKİ (ISTANBUL WATER SEWAGE AFFAIRS) SERVICE BUILDING Eyüp / İstanbul

It has a 4500 m2 covered area in total in 6 floors with an area of 1200 m2 on 8 Acres of Land. It started in November 2014, and will be able to be delivered to the institution in 24 months.

ESENYURT MUNICIPALITY CULTURAL CENTER

In the Cultural Center which has 7995 m2 closed area on 3 floors, the 1st Floor is the Car Park, the 2nd Floor is the Society Market Place, the 3rd Floor is the Conference Hall, Theatre and Exhibition Halls, is a Project which was built by Kırıklar İnşaat A.Ş. for Esenyurt Municipality.